Expansion of the Centre d'exploitation Vieux Longueuil for the Réseau de Transport Longueuil, Québec Fall 2008 Réseau de Transport Longueuil Groupe Aecon Québec Ltée 483 tons 78,300 square feet Petrone Architects Dessau inc. |
Detail : This was a special challenge from the moment we bid on the project. Though the tonnage wasn’t particularly great, 24 78’ 0" trusses had to be built in time to enable a regular flow to the work area once our raising gangs were mobilized. Four of the trusses weighed nearly 20,000 pounds each.All our team masterfully orchestrated the logistics of design, detailing and production, and delivery and installation at the work site. Once this challenge was met, the onsite installation work was unstoppable.
|