YEAR 2008
|
Project : |
Mechtronix ch. de la Côte-de-Liesse, Montréal,Qc Automne 2008 Mechtronix inc. Groupe Montoni Div. Construction 115 tons 22,485 square feet DCYSA Architecture & Design AP Consultant |
Detail : With an architectural design evoking the elegant curves of the aerospace industry, Mechtronix is the type of project where everyone wants to admire the resulting photographic images upon completion of the work. The project posed quite a challenge for Select Steel and its engineers, AP Consultants, to carry out the various stages from design to installation. The general contractor, the client and, of course, everyone at Select Steel were justifiably proud of the appealing, architecturally-aesthetic structural components, nearly 3 M long cantilever beams and uncommonly.
|
| Photos : |
||||